Establish product and modality fit first
Capability claims are cheap; relevant experience is not. Start by matching the modality and the specific technology, then narrow by stage and scale.
| Modality | Fit questions that matter most |
|---|---|
| Small molecules | Route chemistry and hazardous steps; highly potent handling and containment; solid form and particle engineering; oral solid dose or sterile formulation capability |
| Monoclonal antibodies and recombinant proteins | Expression system (mammalian such as CHO, or microbial); cell line development and ownership of the cell line; bioreactor scale and single-use or stainless steel; viral safety strategy; platform process data |
| Antibody-drug conjugates and other conjugates | Whether antibody, payload-linker and conjugation are under one roof or across partners; highly potent containment; analytical characterization of the conjugate |
| Cell and gene therapies, viral vectors, mRNA | Process platform (AAV, lentiviral, mRNA and lipid nanoparticle); aseptic processing; release testing turnaround; patient-specific logistics for autologous products |
For biologics made in human or animal cell lines, viral safety is a defining capability. ICH Q5A(R2), in effect in the EU since June 2024, combines cell line and raw material testing, process viral clearance and product testing, adds next-generation sequencing as a virus detection method, and allows prior knowledge, including a manufacturer’s platform experience, to inform viral clearance evaluation [1]. Ask whether the CDMO has platform viral clearance data relevant to your process.
The ArgusBio directory currently documents biologics CDMOs, filterable by modality, expression platform and drug substance or drug product.
Match the CDMO to your development stage
GMP expectations grow with the program, and the step from Phase 1 to Phase 2 supply matters more than many founders expect.
- Phase 1 (United States). Most Phase 1 investigational drugs are exempt from 21 CFR Part 211, though still subject to statutory CGMP, and FDA’s 2008 guidance describes the controls expected [3] [2].
- Phase 2 and beyond. That exemption ends once the investigational drug is made available for Phase 2 or Phase 3 trials, and FDA’s Phase 1 guidance does not apply to material manufactured for those trials [3] [2]. A CDMO adequate for first-in-human supply needs to show it can support Part 211 compliance for later studies.
- Active ingredients for clinical trials. ICH Q7, which covers drug substance (including recombinant proteins) but excludes vaccines, whole cells and gene therapy active substances, expects controls consistent with the stage of development and recognizes that process validation is normally inappropriate where a single batch is made or the process is still changing, relying instead on controls, calibration and, where appropriate, equipment qualification [4].
- EU clinical supply. GMP for investigational medicinal products in the EU, including Phase 1 material (there is no equivalent of the US Phase 1 exemption), is set by Commission Delegated Regulation (EU) 2017/1569 and its detailed guideline, alongside EudraLex Volume 4, and requires a manufacturing or import authorisation and Qualified Person certification; advanced therapy investigational products follow Part IV rather than the detailed guideline [6]; sterile products are subject to the revised Annex 1, fully applicable since August 2024, and biological substances to Annex 2 [5].
- Commercial readiness. FDA’s process validation guidance describes three stages, process design, process qualification and continued process verification, and excludes clinical trial material from its definition of the commercial manufacturing process [7]. Commercial process validation capability matters when you choose a partner you hope to keep through launch. Clinical supply is not exempt from validation altogether: for sterile products, sterilization and aseptic processing (including media fills) must be validated or demonstrated from the first clinical batch, and for biologics, viral clearance must be demonstrated [2] [6].
Drug substance, drug product, or both
Many CDMOs are strong in one and partner for the other. Biologics drug substance manufacturers frequently rely on separate companies for fill-finish, which is not a problem if you know it and the interfaces are managed.
| Approach | Advantages | Risks to manage |
|---|---|---|
| One CDMO for drug substance and drug product | One quality agreement and schedule; fewer shipments; simpler release | Concentration risk; one weak capability compromises both |
| Separate drug substance and drug product providers | Best fit for each step; more scheduling options | Two quality agreements; drug substance shipping and stability; coordination of release and investigations |
| CDMO-managed partner for one step | Single point of contact | You still need visibility of the partner site, its audits and its quality agreement terms |
Q7 expects contract manufacturers not to pass work to subcontractors without the contract giver’s evaluation and approval [4]. Ask for every site and partner that will touch your product.
Manufacturing technologies and capacity
- Scale and equipment. Ask for the bioreactor or reactor scales available for your next two campaigns, not just the largest on site.
- Single-use versus stainless steel. Single-use systems can shorten changeover and suit multi-product clinical sites; stainless steel may suit large commercial volumes. Ask about supply continuity for single-use components.
- Capacity and slot timing. Ask when the next slots are, how far ahead they are booked, what reservation fees apply, and what happens to your slot if an earlier campaign overruns.
- Supply continuity. ICH Q9(R1) added the role of quality risk management in addressing product availability risks and supply chain control [8]. Ask how the CDMO assesses single points of failure in raw materials and equipment.
Quality systems and the quality agreement
You cannot outsource responsibility. Under 21 CFR 211.22, your quality control unit remains responsible for approving or rejecting drug products manufactured, processed, packed or held under contract by another company [3]. ICH Q10 expects the company to assess a contract acceptor’s suitability and competence before outsourcing, define responsibilities in writing, and monitor performance [9].
FDA’s quality agreement guidance expects the agreement to define which party performs each CGMP activity, to be drafted by both quality units, and to be separate from, or severable from, commercial terms. Typical content includes scope, change control, deviation and investigation handling, and the agreement’s own life cycle [10].
Checklist
Quality agreement topics to settle
- Responsibility for each GMP activity, including testing and release steps [10]
- Change control: which changes need your prior approval; Q7 expects approval of changes to process, equipment, test methods and specifications [4]
- Deviation, out-of-specification and investigation timelines and your participation
- Batch record review and disposition responsibilities
- Audit rights, including for-cause audits and subcontractor sites [4]
- Data governance, record retention and your access to raw data [11]
- Regulatory inspection notification and support
Data integrity is part of quality, not a separate topic. FDA’s data integrity guidance sets out expectations on audit trail review, access controls and original records that translate directly into audit questions for a manufacturer’s laboratories [12].
Technology transfer
Most emerging biotechs will transfer a process at least once: from an academic or discovery lab, between CDMOs, or to a larger site for later phases. ICH Q10 treats technology transfer as a product lifecycle stage and expects knowledge transfer when product ownership changes [9]. For biologics, a process change across sites or scales may require demonstrating comparability under ICH Q5E [13].
Questions to ask
Technology-transfer questions
- 1.What do you need from us, in what format, and by when?
- 2.How many engineering or demonstration runs do you plan before GMP manufacture?
- 3.How will you show the process performs as expected at your site, and what comparability data will we receive?
- 4.Who owns process improvements made during development at your site?
- 5.If we leave, what documentation, cell banks, reference standards and methods will you transfer, at what cost?
Analytical support and stability
Release and stability testing often set the true timeline. Ask which methods are run in-house, which are subcontracted, and how long release takes after the batch is made.
- Method development, qualification and validation responsibilities across phases
- Reference standard strategy and who maintains it
- Stability program design and storage capacity. 21 CFR 211.166 requires a written stability program, and ICH Q1A(R2) describes registration stability expectations such as data on at least three primary batches; for biotechnological products, ICH Q5C applies [3] [14]
- A consolidated ICH Q1 stability guideline is in draft and, when final, will supersede Q1A–F and Q5C; check how the CDMO is preparing [15]
- Development knowledge to support the pharmaceutical development section of your filing, described in ICH Q8(R2) [16]
Supply and logistics
- Cold-chain shipping of drug substance and drug product, including temperature excursion handling
- Clinical packaging, labeling and distribution: in-house, partner, or your separate clinical supply vendor
- Qualified Person release for EU trials and import testing requirements [5]
- Storage of retained samples and records
- Contingency if the site faces an inspection finding or capacity loss
Contracts and change orders
CDMO budgets change for predictable reasons. Agree the mechanics in advance.
| Term | What to clarify |
|---|---|
| Batch failure | Who pays when a batch fails, and how root cause determines liability |
| Reservation and cancellation fees | When slots are committed and what postponement costs |
| Raw materials | Pass-through pricing, mark-ups, long-lead items and who bears expiry |
| Change orders | Triggers, approval authority, unit rates and response times |
| Intellectual property | Ownership of process improvements, cell lines and analytical methods |
| Exit | Transfer support, documentation and materials on termination |
Vendor selection criteria and questions
Questions to ask
Questions to ask every CDMO
- 1.Which products of our modality and expression system or chemistry have you taken through the stage we are entering?
- 2.Which specific site would make our product, and what is its regulatory inspection history?
- 3.What capacity is available at our required scale, and when?
- 4.Which steps and tests are subcontracted, and to whom?
- 5.How do you handle deviations and investigations, and how quickly are sponsors informed?
- 6.Can we see a template quality agreement before we negotiate commercial terms?
- 7.What viral safety, stability or platform data can you bring that shortens our program?
- 8.What would make you decline or delay our project?
Checklist
Selection checklist
- Modality and technology experience demonstrated with comparable products
- Stage-appropriate GMP capability, including Part 211 readiness for Phase 2 and later and, for EU trials, EU GMP and Qualified Person certification from Phase 1
- Drug substance and drug product plan, with every site and partner identified
- Capacity confirmed in writing for the next campaigns
- Quality agreement terms acceptable, including audit rights and change control
- Analytical and stability plan with in-house and subcontracted tests identified
- Technology-transfer plan and exit terms
- Commercial terms for batch failure, raw materials and change orders understood
- Audit completed by your quality function or a qualified auditor before GMP work
Start from the biologics CDMO directory to see which organizations publicly document your modality and stage, compare them side by side, then use these questions to qualify the shortlist.
From guide to shortlist
Explore 20 documented biologics cdmos providers
Filter by the criteria in this guide, read the sources behind each capability, and compare up to four providers side by side.
Open the biologics cdmo directoryReferences
Each source was accessed on the date shown. Status is as stated by the publisher at that time; check for revisions before relying on a specific requirement.
- [1]ICH Q5A(R2) Viral Safety Evaluation of Biotechnology Products Derived from Cell Lines of Human or Animal Origin (opens in a new tab)ICH / European Medicines Agency · Step 5; effective 14 June 2024 · accessed November 3, 2026
- [2]Current Good Manufacturing Practice for Phase 1 Investigational Drugs (opens in a new tab)U.S. Food and Drug Administration · Final guidance, July 2008 · accessed November 3, 2026
- [3]21 CFR Parts 210 and 211 — Current Good Manufacturing Practice (opens in a new tab)U.S. Code of Federal Regulations (eCFR) · Current regulation (eCFR current to 30 October 2026) · accessed November 3, 2026
- [4]Q7 Good Manufacturing Practice Guidance for Active Pharmaceutical Ingredients (opens in a new tab)ICH / U.S. Food and Drug Administration · Revision 1, September 2016 · accessed November 3, 2026
- [5]EudraLex Volume 4 — Good Manufacturing Practice (GMP) guidelines (opens in a new tab)European Commission · Current; includes Regulation (EU) 2017/1569 and Annex 1 (applicable 25 August 2024) · accessed November 3, 2026
- [6]Detailed Commission guidelines on good manufacturing practice for investigational medicinal products for human use, C(2017) 8179 (opens in a new tab)European Commission · Adopted 8 December 2017 · accessed November 4, 2026
- [7]Process Validation: General Principles and Practices (opens in a new tab)U.S. Food and Drug Administration · Final guidance, January 2011 (Revision 1) · accessed November 3, 2026
- [8]ICH Q9(R1) Quality Risk Management (opens in a new tab)ICH / European Medicines Agency · Step 5; effective 26 July 2023 · accessed November 3, 2026
- [9]ICH Q10 Pharmaceutical Quality System (opens in a new tab)ICH / European Medicines Agency · Step 5; effective 1 June 2008 · accessed November 3, 2026
- [10]Contract Manufacturing Arrangements for Drugs: Quality Agreements (opens in a new tab)U.S. Food and Drug Administration · Final guidance, November 2016 · accessed November 3, 2026
- [11]‘GXP’ Data Integrity Guidance and Definitions (opens in a new tab)Medicines and Healthcare products Regulatory Agency (UK) · Revision 1, March 2018 · accessed November 3, 2026
- [12]Data Integrity and Compliance With Drug CGMP: Questions and Answers (opens in a new tab)U.S. Food and Drug Administration · Final guidance, December 2018 · accessed November 3, 2026
- [13]ICH Q5E Comparability of Biotechnological/Biological Products (opens in a new tab)ICH / European Medicines Agency · Step 5; effective 1 June 2005 · accessed November 3, 2026
- [14]ICH Q1A(R2) Stability Testing of New Drug Substances and Products (opens in a new tab)ICH / European Medicines Agency · Step 5; effective 1 August 2003 · accessed November 3, 2026
- [15]Q1 Stability Testing of Drug Substances and Drug Products (draft) (opens in a new tab)ICH / U.S. Food and Drug Administration · Draft guidance, June 2025 (ICH Step 2, 11 April 2025) · accessed November 3, 2026
- [16]ICH Q8(R2) Pharmaceutical Development (opens in a new tab)ICH / European Medicines Agency · Step 5 · accessed November 3, 2026
This guide is general information for experienced professionals, not legal or regulatory advice. Requirements vary by product, jurisdiction and development stage.